START A SEAMASTER PROJECT · CWG ENGINEERING

Start with the water.
Build the right system.

Send the source, application, required output and site conditions. The first review identifies the correct DESAL route, missing inputs and next engineering step.

SEAMASTER desalination project engineering
OFFICIAL CONTACT

CWG d.o.o.

info@cwg.hr+385 1 6608 807

Braće Radića 132
10410 Mraclin-Velika Gorica
Croatia

CWG d.o.o.HQ · SALES · SERVICE
Croatia · EUENGINEERING BASE
Mon–Fri 08:00–16:00LOCAL OFFICE HOURS
BWRO + SWROTWO SOURCE ROUTES
International reviewPROJECT-SPECIFIC SCOPE

STRUCTURED PROJECT INTAKE

A useful first inquiry reduces assumptions.

Nominal capacity alone is not enough. Source-water chemistry, required product quality, operating window and physical interfaces determine the appropriate desalination architecture.

01Complete the project brief02Attach available analysis and drawings03CWG reviews the technical route04Missing data and next steps are defined
Review the full project checklist
PROJECT INTAKE · STEP 01

Tell us what the water service must deliver.

Required fields provide enough information for the first technical routing. Detailed design follows verified project data.

CWG d.o.o. uses the details you send to respond to your inquiry. Read our Privacy notice.

Opens your email application addressed to info@cwg.hr. Attach the water analysis, drawings or photographs before sending.

WHAT TO PREPARE

Six inputs create a better engineering starting point.

If information is not yet available, state it clearly. The first review can identify which measurements, analyses or site details are required before final selection.

01Source-water type, laboratory analysis and seasonal variation02Application, daily demand, peak profile and operating hours03Required product-water quality and final use04Intake, utilities, installation space and discharge route05Storage, distribution, redundancy and service expectations06Project location, destination standards and delivery schedule
SEAMASTER desalination pretreatment and project equipment
ANALYSIS + DUTY + INTERFACESTHE ENGINEERING STARTING POINT

CHOOSE THE FASTEST ROUTE

From preliminary selection to project engineering.

01

Preliminary model search

Use the multilingual Finder when the application, water class and required output are already known.

Open Watermaker Finder
02

Water-analysis review

Send the current laboratory report when source chemistry or pretreatment requirements need technical review.

Send water analysis
03

Complete project proposal

Use the structured inquiry for commercial, industrial, municipal, marine or containerized system requirements.

Start project brief

OFFICIAL CWG CONTACT

SEAMASTER desalination engineering from Croatia.

SEAMASTER is the specialized desalination platform of CWG d.o.o. The details shown here follow the official CWG contact page.

Visit official CWG contact page
HQ & SALES & SERVICE CENTERCWG d.o.o.

Braće Radića 132
10410 Mraclin-Velika Gorica
Croatia

+385 1 6608 807info@cwg.hr Monday–Friday · 08:00–16:00Fax: +385 1 6608 809

PROJECT CONTACT FAQ

Before you send the inquiry.

01What information should I send with the first inquiry?

Start with the application, project location, source-water type, required output and intended water use. If available, attach the current laboratory analysis, installation drawings, equipment-room dimensions and photographs.

02Can I request a quotation without a water analysis?

A preliminary route can be discussed, but reliable pretreatment, recovery, membrane duty, materials and performance cannot be finalized without sufficient source-water data. The team can identify the analysis required for the next step.

03Can SEAMASTER review international projects?

Yes. State the destination, electrical supply, climate, applicable project standards, logistics and expected service scope. The final proposal confirms the actual supply and documentation boundary for that location.

04Is the Watermaker Finder a quotation?

No. The Finder provides a preliminary catalog starting point. A technical and commercial proposal follows review of the actual source, duty, installation and project requirements.

READY TO DEFINE THE WATER SERVICE?

Start with verified data and a clear operating target.

Use the structured project brief or contact CWG directly for the next engineering step.