ENGINEERING CALCULATORS · YOUR INPUTS, TRANSPARENT RESULTS

Build the preliminary
project water balance.

Five practical tools for early desalination planning. Every result is calculated only from the values you enter.

WORKING SURFACE5 connected calculationsNo data is stored
01
PRELIMINARY PRODUCTION SIZING

Required nominal RO capacity

Translate daily treated-water demand and the realistic production window into an hourly design target.

m³/day
h/day
%

Demand ÷ operating hours × (1 + reserve)

DESIGN CAPACITY0.72 m³/h

719 L/h including the entered reserve.

BASE CAPACITY0.63 m³/h

Before the stated reserve is added.

24-HOUR DESIGN OUTPUT17.25 m³/day

Mathematical output at uninterrupted nominal operation; not a performance guarantee.

Engineering boundary: results are transparent arithmetic from entered values. They are not equipment selection, a performance guarantee, a quotation or a substitute for verified water analysis and project engineering.

HOW TO USE THE RESULTS

Calculate first. Verify before selection.

The tools structure an early project discussion. They intentionally do not insert generic recovery, energy consumption, equipment price or performance values.

Open Knowledge Center
01Use traceable inputs

Record where demand, tariff, recovery, operating days and commercial values came from.

02Keep assumptions visible

Change one input at a time and preserve the operating case behind each result.

03Apply the engineering gate

Confirm the final system against water analysis, site conditions and the CWG proposal.

READY TO TURN THE CALCULATION INTO A PROJECT?

Send the input case and water analysis.

CWG will verify the source, duty, product-water target, system route and missing engineering inputs.